
Recommended Max. Operating Pressure
Max. Operating Temperature
8.3. Unpacking
a) Pull off front insulation casing - there are no screws or clips to undo
b) Check that the box contains ALL the materials listed below. Immediately report missing or damaged
parts.
Direct Flow Pump Station with Controller and Insulated Cover
Pump Station Mounting Kit
(1 x 1 3/8” Steel Sleeve)
(2 x 3” Wall Screws)
(2 x 1 1/2” Wall Screws)
(1 x 1” Wall Screws)
(4 x 1 1/2” Wall Anchors)
(4 x Washers)
Solar Controller Collector Temperature Sensor (RED)
Solar Controller Tank Temperature Sensor (Gray)
Solar Controller Data Log Kit
(1 x 1GB SD Card)
(1 x SD Card / USB Adapter)
8.4. Mounting
a) Mounting Surface: The pump station can be mounted on most wall types using the provided screws. If
building structural members are not available a wooden board or the provided hollow wall anchors should
be used to provide secure attachment points.
b) Pipe Layout: It is a good idea to layout all piping before securing the pump station in place, to make sure
that everything fits properly and sensor cables can reach the tank, etc.
c) To mount the pump station:
Step 1. Mark and drill a pilot hole for center screw.
Step 2. Mark and drill a pilot hole 6-1/4” left of center hole for controller bracket screw.
Step 3. Insert steel sleeve in insulation around center hole.
Step 4. Insert the plastic hollow wall anchors into the holes if building structural members are not
available.
Step 5. Using a Phillips head screwdriver and the appropriate screws and washers secure the pump
station to the wall.
Apricus Solar Collector Installation & Operation Manual - USA
Copyright © 2011 – Apricus Inc Doc: A7-05.4.12-PB Page 64 of 129
Komentarze do niniejszej Instrukcji