Cli-mate CLI-AP30 Dokumentacja Strona 58

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 120
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 57
7.3. Unpacking
a) Pull off front insulation casing - there are no screws or clips to undo
b) Check that the box contains ALL the materials listed below. Immediately report missing or damaged
parts.
Qty
Components
1
Closed Loop Pump Station with Controller and Insulated Cover
1
Pump Station Mounting Kit
(1 x 1 3/8” Steel Sleeve)
(2 x 3” Wall Screws)
(2 x 1 1/2” Wall Screws)
(1 x 1” Wall Screws)
(4 x 1 1/2” Wall Anchors)
(4 x Washers)
1
Solar Controller Collector Temperature Sensor (RED)
2
Solar Controller Tank Temperature Sensor (Gray)
1
Solar Controller Data Log Kit
(1 x 1GB SD Card)
(1 x SD Card / USB Adapter)
1
EXT-30 Expansion Tank
(shipped in separate box)
Apricus Solar Collector Installation & Operation Manual - USA
Copyright © 2011 – Apricus Inc Doc: A7-05.4.12-PB Page 55 of 129
Przeglądanie stron 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 ... 119 120

Komentarze do niniejszej Instrukcji

Brak uwag